
Gold Color Plating Zamak Die Casting Car Parts (STK-ZDC-232)
Xiamen Stick Industry Co., Ltd.- Type:Towel Handle
- Material:Zinc Alloy
- Color:Chrome
- Product Name:Chrome Plating Zinc Die Casting Towel Handle
- Applied Material:Zinc, Zinc Alloy, Zamka, Zamc
- Materials Available:Zamak 2, Zamak 3, Zamak 5, Zamak 7, Za8, Za27 etc.
Base Info
- Model NO.:STK-ZDC-232
- Process:Zinc Die Casting
- Size:as Per Customers Request
- Tolerance:+,-0.05mm
- Weight Available:10g to 5kgs
- Lead Time:2-4 Weeks
- Surface Treatment:Polishing, Chrome Plating, Sand Blasting, Powder C
- Secondary Machining:CNC Machining, Tapping, Drilling, Grinding etc.
- Machine Size:80tons-280tons
- Service:OEM or ODM
- Drawing Formats:Igs, Step, X-T, Pdf, JPG, Dxf, Dwg
- Design Software:PRO,E, Auto CAD, Solid Work 2001, Ug
- Usage:Automotive,Industrial,Household,Medical etc.
- Transport Package:Export Carton
- Specification:OEM
- Trademark:STK or customized
- Origin:Fujian, China
- HS Code:7907009000
- Production Capacity:500, 000pieces,Month
Description
Zinc Die Casting Equipment List
Our service include:Moulds, plastic injection molding, Aluminum/Zinc Die casting, CNC Machining, Sheet Metal Forming, Surface Treatments, Assembly and packaging.
Our factory overview:



Certificate:


FAQ:
Q1: How long is your delivery time?
A1: Mold leadtime:Within 3-5 week upon we receive the 50% of mold charges.
Batch production leadtime: Within 2-4 week upon we receive the 30% deposit.
Q2: Are you trading company or manufacturer ?
A2: We are factory, with about fifteen years experience of mould design and mold making, production.
Q3: What is your terms of payment ?
A3:Mold :50% deposit +50% after the samples is approved.
Batch production: 30% deposit +70% before shipment.
Q4: How can I get your quotation?
A4: You could contact us via Email and send us your drawings inclusive of 2D and 3D(.STEP or .IGES files) and detail requirements.Then our designer and engineers will work on them and submit competitive quotation to you. If you don't have 3D drawing, samples is also ok, our designer will make 3D drawing for you according to sample.
Q5:How long will it take for production?
A5: It depends on the quantity and the complexity of the products you want.
We will pay great attention to your any question or enquiry.
If any questions, please feel free to contact us at any time.