Bathroom Fittings & Accessories

Marine Fittings 90 Degree Stainless Steel Boat Deck Drain

ABLinox (Guangdong) Precision Metal Technology Co., Ltd.
  • Material:Stainless Steel 304,316
  • Surface:Satin or Mirror
  • Delivery Time:20-25 Days After Deposit Confirmed
  • Glass(T):10mm-20mm
  • Export Markets:Global
  • Wattanty:10 Years

Base Info

  • Top Handrail Size:38.1mm,42.4mm,50.8mm
  • Transport Package:Standard Export Cartons
  • Specification:CE, ROHS, SGS
  • Trademark:ABLinox
  • Origin:Guangdong
  • HS Code:730890000
  • Production Capacity:100, 000PCS,Month

Description

Overview Product Description 

 

Our Advantages
  1. Hot Sell Products

     

    Marine Fittings 90 Degree Stainless Steel Boat Deck DrainMarine Fittings 90 Degree Stainless Steel Boat Deck DrainMarine Fittings 90 Degree Stainless Steel Boat Deck DrainMarine Fittings 90 Degree Stainless Steel Boat Deck Drain

     

    Company Introduction

     

    Production Process

     

    StepsTimeTooling MakingCNC Center7 days

    Casting ProcessWax Injection2 daysSand Shell Molding5 daysDewaxing1 daysPouring1 daysCutting1 daysGrinding1 daysCleaning1 days

    Machining ProcessCNC2 daysDrilling & Tapping2 daysWelding2 daysStamping1 daysPolishing5 days
    AssemblingUltrasonic Washing1 daysWater Testing1 daysAssembling2 daysRemark: The production time base on standard quantity and process Quality Control

     

    Marine Fittings 90 Degree Stainless Steel Boat Deck DrainCertifications
    Marine Fittings 90 Degree Stainless Steel Boat Deck DrainOur mission
    To change the world's view about Chinese product.
    To be the leader in precision casting industry
    Our dream
    1. FAQ

       

      1.Where is your factory?
      Our factory located in Zhaoqing City, Guangdong Province. Factory 50000 square meters with 265 workers.

      2.What is your payment term?
      We do T/T, 30% deposit, balance before delivery. We can also accept L/C.

      3.What is the production time?
      Casting part need 20 to 30 days.
      Balustrade and handrail accessories need 25 to 35 days.
      Faucet and shower need 40 to 60 days.

      4.Is that possible to visit the factory?
      Sure, we sincerely welcome you to visit our factory, we can also pick you from the hotel.